Location
Denton County, Texas, United States.
A source-linked profile of HyProMag USA's phased Dallas–Fort Worth development for recycled NdFeB magnets, HPMS processing and magnet manufacturing.
Denton County, Texas, United States.
Planned development with separate finishing and integrated manufacturing targets.
End-of-life NdFeB magnets and production scrap converted into recycled magnets and co-products.
| Organisation | HyProMag USA |
|---|---|
| Process | Short-loop / remanufacturing |
| Technology basis | HPMS and recycled magnet manufacturing |
| Generic input | End-of-life NdFeB magnets and production scrap |
| Recorded output | Recycled NdFeB magnets and separately tracked co-products |
| Current development basis | Long-term facility lease finalized 21 July 2026; phased plan published 27 July 2026 |
The Dallas–Fort Worth long-term lease was reported as finalized in July 2026. A lease and phased plan support a concrete planned project; they do not establish construction or commissioned recycling equipment.
Finished-magnet capability is targeted for the first half of 2027, using recycled magnet blocks from the existing UK and Germany supply chain.
Integrated HPMS and magnet manufacturing are targeted for the second quarter of 2028. Both dates remain forward-looking company targets.
The hub has multiple phases and material streams. REE Monitor reports recycled magnet output separately from co-products, so the figures are not silently added into one “recycling capacity” total.
| Phase or stream | Figure | REE Monitor interpretation |
|---|---|---|
| Initial integrated phase · Q2 2028 target | 400 t/a recycled magnets + 278 t/a separate co-products | Initial integrated output targets. The earlier H1 2027 finishing plan uses imported UK/German blocks and has no separately verified 400 t/a capacity. |
| Full integrated phase | Approximately 1,526 t/a total magnetic products | Full planned combined product output. A magnet-only split is not verified; the earlier 1,048 t/a breakdown is excluded from current capacity charts. |
| Earlier claim in history | 941 t/a planned recycled magnet output | Retained as an earlier published claim rather than blended with the later phased figures. |
| Actual throughput | Not published | The project is not treated as operating annual production. |
The current primary source is HyProMag USA's 27 July 2026 announcement on the phased Texas Hub. The preceding lease announcement from Mkango provides supporting evidence for the site basis. Together they support a concrete planned project, schedule and staged output targets; they do not establish current commercial throughput.
Open question: will the H1 2027 finishing milestone and Q2 2028 integrated commissioning target remain on schedule, and when will project financing close?
The public record classifies the Dallas–Fort Worth project as planned development with a phased finishing and integrated manufacturing plan. It is not presented as operating commercial production.
No. The early-finishing and integrated-phase dates are forward-looking company targets. They describe planned milestones, not measured throughput or guaranteed material availability.
The profile covers end-of-life NdFeB magnets and production scrap converted into recycled magnets and co-products. REE Monitor keeps the output categories separate instead of combining them into one capacity number.
The protected atlas holds the underlying record, source history and filters. Read the methodology before comparing planned outputs with operating capacity.